Lincoln Fence Line: Lincoln, NE Fence Company and Fence Contractor for Installation and Repair
Lincoln Fence Line works as a Lincoln, NE fence company and fence contractor, and we price every job by the foot. A wood privacy fence here typically runs $27 to $42 per foot installed, so 150 feet lands near $4,000 to $6,300. The final number waits. Utility boxes and sprinkler heads on your lot decide where posts can stand.
Request a quote
Dog, privacy, pool or a storm-bent section? Say which, and the estimator rings back with a first range per foot.
The clay subsoil here in Lincoln's ground swells when it gets wet and shrinks when it gets dry. There are approximately 143 freezing nights here yearly, so putting the posts in the ground properly decides the lifetime of the fence. Always get in writing how the post are going to be set, how deep, or kind of wood.
- Most wood privacy fences here, $27 to $42 per foot installed
- Most fences take the crew 2-4 days
- Nebraska 811 ticket 2 full business days before any digging
- LES box clearances marked on the line before any post is set
- Gates and old fence removal on their own estimate lines

Run the footage by material
Typical prices per foot for Lincoln jobs. Your quote follows a look at the job.
$4,050 to $6,300
Call (531) 229-1489 for your priceAt a glance
| Wood privacy, by the foot | $27 to $42 installed |
|---|---|
| 150 feet of wood privacy | About $4,000 to $6,300 |
| Vinyl, by the foot | $52 to $71 installed |
| Crew on site | 2 to 4 days, most fences |
| Tallest on any part of a lot | 76 inches |
| No permit | Under 7 ft, side or rear yard |
| Utility flags | Nebraska 811, two full business days |
Residential Fence Installation, Repair and Replacement

Fence Installation
Fence installation here on any lot in Lincoln will start from the back lot line. A utility easement typically runs along this back line. Be sure to mark all the LES boxes before digging. The city code wants a fence at least 10 feet from the side of a box with the sticker on it. An average fence on an average-size lot can take crews about two to four days on the site to complete.

Fence Repair
For fence repair, we first want to check if the posts are still stable. A good way to check is to try pushing the post at waist height or higher and see if it rocks back and forth. If it does, this means the footing has let go. Braces can be put up, but they typically only last one season. New footings are usually needed.

Vinyl Fence Installation
Vinyl fence installation can be a good idea if you're planning on staying in your property for many years. Although it will outlast a wood fence for many years, the initial cost is almost double, about $52 to $71 per foot versus $27 to $42 per foot for a wood fence. Keep in mind there is no staining or paint required on a vinyl fence, just hosing it off once in a while.

Chain Link Fence Installation
Chain link fence installation goes well on long side lines and big dog yards. The wind passes easily through the open weave, so the posts carry little load and stay firm for many years. There is a tension wire that is put at the base of the fence. This is stretched tight so the mesh cannot be pushed up. Galvanized means the steel is zinc-coated and will protect it for many years against rust.

Wood and Cedar Fence Installation
For wood and cedar fence installation around Lincoln in the summertime, keep in mind that cedar keeps its shape during the drying time, while pine boards leave the lumber yard wet and will dry out after the fence installation. These pine boards can twist and also shrink and create gaps in the fence, which is great for wind, but not as much for privacy. Pine boards are cheaper than cedar.

Pool Fence Installation
Pool fence installation in Lincoln has a fencing code that states any pool, spa, or hot tub 18 inches or deeper needs a fence or barrier at least four feet tall around these areas. There also cannot be any gap in the fence over four inches. The gates must self-close and self-latch.

Privacy Fence Installation
Privacy fence installation has more room in Lincoln than in most cities, at 76 inches anywhere on a lot and up to 102 inches in a residential rear or side yard with conditions. Coming from a windy city, I do recall years ago not having posts set in the ground deep enough for high winds, which ended up blowing over several sections. We shorten the span and upsize the posts as the height climbs. Dog ear costs less, while board on board keeps covering the yard after the boards shrink. If you want your fence to be 100% non-see-through, pay the extra money for the board-on-board fence style. If you don't care so much about that, then going for dog-ear boards that can shrink and leave gaps later is okay.

Gate Installation and Repair
A gate is a lever, and an 80-pound one puts well over 200 pounds on its hinge post. So we start gate installation with a heavier post, a steel frame and a brace that runs the right way. A gate that swung clean for years and now drags usually has a hinge post on the move, and a caster at the free corner leaves that cause in place.

Fence Replacement and Removal
Fence replacement starts with the old concrete. Close to 45% of Lincoln's houses date from before 1980, and the spot you want for a new post may already hold a footing or two. We dig those out instead of cutting a post flush and burying the stub, then haul the old fence away. Soil from new post holes leaves with it, off your landscape rock.
Comparing fence bids in Lincoln?
Bring the other number if you have one. Give us the footage, the height and the material, and we will set our per-foot range beside it, gates and old fence removal counted separately.
Commercial Fence Installation and Repair
Lincoln fence contractors see the code loosen at the business line, where a fence can reach 102 inches. Tell us the use of the lot, and we draw the fence around the drives and the utility boxes.
Commercial Chain Link and Security Fence
A commercial or industrial district allows 102 inches. We run heavy top rail and a tension wire. The sight triangle at every drive stays open, because the code bars a fence from filling it.
Commercial Lot Line Screening Fences
A shop that backs onto houses can screen the common line at up to 102 inches. Solid panels that tall take the full gust. We keep the spans short and set the posts for the wind.
Apartment and Rental Property Fences
Renters hold about 42% of Lincoln's occupied homes. For a landlord we suggest parts one person can swap on a turnover day, with a single gate key and steel posts behind anything wood.
HOA and Subdivision Fences
HOA and subdivision fences must follow certain rules that are in the covenants of the neighborhood you live in. They can specify things like the type of fence, the material of the fence, the height of the fence, and which side gets the good side of the boards or the railings.
Dumpster Enclosure Fences
We build a solid 6-foot enclosure with drop rods on both gate leaves, which holds up to truck days. A pad near a drive goes to Public Works for sight review first.
Specialty Fence Services and Fence Styles

Aluminum and Ornamental Fence
Ornamental aluminum gives the look of wrought iron with less weight on the posts. Some panels rack 8 to 10 inches along a grade. On steeper ground we step the sections, and the line chases the slope instead of every dip in the lawn. Aluminum suits a front yard or a pool line. Steel stays the stronger pick where a mower or a moving truck will hit it.

Storm and Wind Damage Repair
Lincoln Airport logged a 91 mph gust on August 9, 2025, and more than 34,000 customers lost power. Tall solid sections fail first. Take pictures before anyone moves a panel, then call with the footage that's down and whether a dog needs that yard. We reset the snapped posts and reuse the boards that survived.

Dog Fence
A 4-foot chain link fence suits many dogs, and a 6-foot wood fence also stops the barking at the neighbor. Height changes the bid, so settle it before comparing numbers. Diggers get a bottom wire or a kickboard. Small dogs get puppy pickets at the gate. We build physical fence only, with no buried wire or collar.

Picket Fence
A picket fence marks the front yard and lets the view through. The code would let you go to 76 inches there, and almost nobody needs it. We leave gaps between pickets so a gust can pass. On a corner lot, or beside a drive or alley, the sight review still applies at any height under 7 feet.

Split Rail and Acreage Fence
One square acre is about 835 feet of line, so two-rail against three-rail is a real decision out past Waverly and Hickman. Add wire mesh when a dog shares the pasture. We would skip solid panels on a long open line, since the wind out there has nothing else to push on. Towns and county roads may follow rules of their own.

Fence Staining and Sealing
New wood dries first, since stain on wet boards doesn't soak in. We wash off the mill glaze, then choose between a stain, which colors the wood, and a sealer, which guards it. Sprayed stain drifts. Siding gets masked and the kids' bikes get moved before the first pass.
Lincoln Fence Rules: 76 Inches, LES Boxes and the Back Lot
The city lets a tall fence go nearly anywhere, then keeps it off the green boxes and out of the sight lines at a drive.
What the city allows
- Rear and side yards. Up to 102 inches in a residential district, unless a fence over 76 inches would stand within 4 feet of the main structure next door.
- Permit. None under 7 feet beside or behind the house, and a building permit over 7 feet. For a shorter front-yard fence, ask Building and Safety.
- Corners and drives. Public Works reviews sight distance under 7 feet, 402-441-7711.
- Measuring. From the ground under the fence. A berm or retaining wall that lifts it counts.
- LES equipment. Stay 10 feet from the decal side of a padmounted box and 3 feet from the padlock side of a pedestal. Other sides get 12 inches.
Fence Repair or Fence Replacement: Read the Posts
For fence repair versus fence replacement, the first things that typically go are the posts, where they start rotting down by the soil. You can take a screwdriver and start poking the post. If the screwdriver sinks into the wood, the posts are rotted, and we’ll need new posts set.
Repair it
One or two bad posts and straight boards. A single loose picket takes deck screws, and we would not bother sending a crew for that.
Replace it
Most posts in the run going soft together. New boards on tired posts waste the boards.
How a Lincoln Fence Job Runs
Silence after the sale is the common complaint here, so each step names the next.
The job, in order
- You send footage and material, and the estimator rings with a first number.
- We walk the line for the easement, the grade and any old footings.
- A written estimate follows, gates and removal on separate lines, plus the start day.
- We open the Nebraska 811 ticket and handle any sight review or permit.
- Old fence comes out, and posts go in around the sprinkler heads.
- Boards go up, dirt leaves on the truck, and you test the latch.
I had a neighbor whose tree on his property was close to our shared fence. This was a beautiful two-sided fence, so it looked the same on both sides. After an ice storm, a large limb came down and took out two sections of the fence. He ended up hiring the cheapest fence guy he could find, and the patch job didn’t look anything like the original fence. It goes to show you the cheapest is not always the best option.
How Long a Fence Takes in Lincoln
Most of the wait comes before the first post.
Fence timeline, step by step
| Step | Usual time | What sets the pace |
|---|---|---|
| Utility flags | 2 full business days | Nebraska 811 notice |
| Post concrete cure | 1 to 4 days | The mix, fast-set or not |
| Whole job on site | 2 to 4 days | Footage and gates |
What a Fence Costs in Lincoln
Lincoln fence prices by material
| Fence or job | Usual cost | Unit |
|---|---|---|
| Wood privacy | $27 to $42 | Per foot |
| Vinyl | $52 to $71 | Per foot |
| Chain link | $23 to $35 | Per foot |
| Picket | $18 to $30 | Per foot |
| Split rail | $25 to $40 | Per foot |
| Aluminum | $25 to $75 | Per foot, US |
| Old fence removal | $10 to $20 | Per foot, US |
| Fence repair, typical | $300 to $900 | Per job, US |
| Gate repair | $50 to $400 | Per gate, US |
Rows without “US” are for zip 68502 in 2026, labor and materials on a 150-foot run over easy ground. US rows are national. None is our price list, and the real number follows the walkthrough.
What moves the number
- Height. More boards, bigger posts.
- Gates. A drive pair needs two heavy posts.
- Old concrete. Footings dig out slowly.
- Slope. Steep grades get stepped or racked.
Where to spend less
Chain link on the side nobody sees.
Where to spend more
Gate posts first, then steel behind cedar. Boards swap out on a Saturday. A failed footing takes a crew.
If you’re planning on staying in your property for many years to come, pay for steel posts over wood posts that can rot and need replacing. Even when the boards on the fence and the rails fail, you shouldn’t have to dig out the old posts. Just add new boards.
Where We Build Fences Around Lincoln
Lincoln Fence Line works all over Lincoln, NE, and in the Lancaster County towns next to it, from Waverly and Hickman out toward Crete and Seward.
Lancaster County, NE
- Waverly
- Bennet
- Hickman
Cass County, NE
- Eagle
- Weeping Water
- Louisville
Saline County, NE
- Crete
- Wilber
Seward County, NE
- Milford
- Seward
Saunders County, NE
- Ashland
- Wahoo
Otoe County, NE
- Syracuse
The 76-inch rule and the LES clearances on this page are the City of Lincoln's. A town or county outside the limits may answer to its own office, so each estimate starts by checking the address.
Clay subsoils that shrink and swell are common across southeast Nebraska, and about 143 nights a year reach freezing.
Lincoln Fence Questions, Answered Before You Dig
How much does 100 feet of fence cost in Lincoln?
In wood privacy, about $2,700 to $4,200 at the 150-foot rate. Shorter runs tend to sit at the upper end, because the trip and the setup spread over fewer posts.
Are vinyl fences any good in Nebraska?
Vinyl fences here make a great option, as they never need to be stained, only hosed down once in a while. In heavy winds, it's the fastening that decides how long it lasts. Plastic tab rails can pop out in gusts, while screwed rails stay on.
Who pulls the fence permit in Lincoln?
A contractor can, and you should check that it did. Building and Safety sits at 555 S 10th St, Suite 203, and wants two copies of a site plan showing elevation and the type of construction.
Where is my property line in Lincoln?
Often in this area, your property would start four feet past the sidewalk, but it is important to find the actual land line with a registered surveyor to confirm it. A survey usually runs $200 to $1,200.
Who pays if my fence blocks the LES easement?
Most often, the owner has to pay for the fix if your fence blocks the easement. It slows the city down in repairing outages, as line crews need walking access. You can place a gate or a lift-out panel there. That usually suffices for the city.
Can I put barbed wire on a fence in Lincoln?
Lincoln City Code has banned barbed wire inside the city limits, except for high up on the fence, above five feet off the ground, and one foot away from any public way. Electric fence is unlawful, except for alarm systems.
Does Nebraska 811 mark sprinkler lines?
Since sprinkler lines are considered private lines, Nebraska 811 does not mark them. Whether it's sprinkler pipe or power for a shed or a dog wire, the owner is responsible for flagging the heads and the valve box.
Should I take the lowest fence bid?
Drive past a fence that bidder already built. Tilted posts show from the street. Then compare footage, height and post type line by line, since a low number often leaves removal out.
We read the lot before we write the price
A walk along the line shows the easement, the utility boxes, the sprinkler heads and the grade. Those decide where posts can stand and what the job costs, so they go on the written estimate line by line.
Request a quote
Ring (531) 229-1489 to talk it through, or send the fence details here and the estimator will ring you.
